Wednesday, November 11, 2026
The Urdu Post
THE URDU POSTPakistan & World News
BREAKING

Opening of Rawalpindi Ring Road delayed for eighth time

Hamza FarooqFinancial & Markets Correspondent • Islamabad / Lahore Bureau
Opening of Rawalpindi Ring Road delayed for eighth time

📌 Key Highlights & Quick Takeaways:

  • The inauguration of Rawalpindi Ring Road has been postponed for the eighth time, on November 6, Chief Minister Punjab Maryam Nawaz will not.
  • The Punjab Ring Road Authority made the inauguration conditional on the completion of the tolling booth system and weigh stations. According.
  • Before the inauguration of the Ring Road, all arrangements were completed at Banth Interchange GT Road. The 38.3 km long route from Banth In.

The inauguration of Rawalpindi Ring Road has been postponed for the eighth time, on November 6, Chief Minister Punjab Maryam Nawaz will not inaugurate the project.

The Punjab Ring Road Authority made the inauguration conditional on the completion of the tolling booth system and weigh stations. According to officials, the ring road will be opened for traffic only after the toll tax collection system is completed.

Before the inauguration of the Ring Road, all arrangements were completed at Banth Interchange GT Road. The 38.3 km long route from Banth Interchange to Thalian Motorway Link is complete, four interchanges are also ready Banth, Chak Bailey Khan, Adiala and Chakri Interchanges are complete, the fifth Thalian Interchange is still under construction.

Want to read this exact news report in Urdu Nastaleeq?🇵🇰 یہ خبر اردو میں پڑھیں

Hamza Farooq

News Desk

Verified editorial report by The Urdu Post newsroom, compliant with journalistic ethics and verification standards.